← cd ../works
WORKS / CONSULTING & BRAND / EXAMPLE 01

Café Equipment
Supply & Design.

Fictional example · Independent café · Streetfront
A public example of the questions and decisions behind my equipment and space consulting.

01 / BRIEF

What kind of café
are we designing?

Start with the goals, constraints, and priorities of a fictional café. These guide decisions about equipment and space.

PUBLIC EXAMPLE / FICTIONAL“00 Independent Café” is a fictional streetfront café. Assuming a space of about 15 pyeong, this example shows the order in which I ask questions and narrow down options.
TypeIndependent café
SettingStreetfront
SizeApprox. 50 m²
02 / PLAN

Reading the space

A monochrome schematic simplifies roughly 15 pyeong into a 10 × 5 m rectangle. It is not a measured or construction drawing.

FIG. 01 / SCHEMATIC FLOOR PLANMONOCHROME STUDY
Conceptual café plan: central street entrance, order and pickup bar on the left, storage and washing behind the bar, seating on the right. Dimensions are assumed.

Illustrative layout. The entrance, utilities, drainage, fire and building requirements, accessibility, and actual dimensions require an on-site review.

01Street and entry
02Order and pickup
03Preparation and storage
04Seating and waiting
03 / FLOW

Two paths through the café

Identify where guest and staff movement meet before deciding where the bar and pickup points belong.

GUEST / 01

Entry

Can guests locate ordering and seating as soon as they enter?

GUEST / 02

Order and wait

Will a queue block the entrance or seating aisle?

TEAM / 03

Preparation

Does storage → grinding → brewing → serving create unnecessary trips?

SHARED / 04

Pickup and return

Do handoff and used-cup return points interfere with each other?

04 / EQUIPMENT

Criteria for equipment

Check the menu, peak demand, staffing, and utilities before selecting equipment.

ZONE 01

Espresso bar

Machine · grinder · water treatment · worktop / size for peak demand and brewing method

ZONE 02

Brewing and drinks

Brewing tools · hot water · refrigeration / adjust bar space and sequence to the menu mix

ZONE 03

Washing and storage

Sink · washing equipment · storage / keep used tools from crossing the preparation path

SELECTION

Record the final choice

Example: document why each candidate was chosen or rejected and its installation needs

05 / PRICE STRUCTURE

How the selling price is built

The fictional example shows which costs and terms to compare, without presenting a sample figure as the right answer.

COST MAP

Separate the costs

  • Supply and selling price per item
  • Shipping, installation, training, and support
  • Options and exclusions
  • Alternatives for different budgets
DECISION LOG

Before the price

Record why this configuration was proposed, what alternatives meet the same need, and how upkeep differs.

No figures appear in this fictional example. Disclosure of real quotes and terms belongs in separately approved portfolio material.
06 / CONSULTING NOTES

Jay Jeongho Kim’s decision log

Show which new facts would change a recommendation instead of presenting one fixed answer.

QUESTIONS TO ANSWER

What consulting needs to establish

  • Core menu and peak order volume
  • Staffing and roles behind the bar
  • Water, electricity, drainage, and storage
  • Initial budget and maintenance plan
EXAMPLE / DECISION

My reasoning in this example

I would map the route from ordering to pickup before sizing the bar around the equipment.

If peak demand, the menu, or staffing changes, I would revisit the bar length and equipment mix. A real project requires measured plans and a utility review.

07 / ACTUAL WORK

Actual portfolio materials
available on request

This page is a public example of the consulting approach. Real plans, equipment, quotes, and outcomes are shared separately after checking what may be disclosed.

BY REQUEST

Request case materials

Share your area of interest and review purpose. I can then explain which cases and details may be shared.

Request case materials →
SHARING SCOPE

What may be shared

Materials containing client or site information are shared only after confirming what may be disclosed and for what purpose.